Request a quote for your construction drawing
Remove element?
Are you sure you want to remove from your selection?
Thank you for your request
Your request has been sent successfully. We are already working on your details and will contact you soon. We prepare your quote personally and will email it as soon as possible, usually within a few hours. Your order is on account; you will receive the invoice by email with the agreed payment term. You can also find it in your business portal.
What to expect:
- We carefully review your request.
- You will receive a response from us as soon as possible.
Payment not completed
Your payment was cancelled or failed. Your request has been saved. You can try again.
Choose your payment method
Select how you want to pay to complete your order.
What type of home do you have?
Select the type of home you want to request a drawing for.
Help me choose
Is it an existing home or a new build?
Our advice: Existing home
For an existing home we first map the current situation. If possible, upload a floor plan or photos. That saves time and costs.
Our advice: New build
For a new build we start from a blank canvas. You receive a complete design with floor plans, elevations and sections, made to measure.
New builds are always custom work
You will receive a quote on request.
For a new build we draw and calculate the entire building, from foundation to ridge. Floor plans, elevations, sections, verification against the Dutch Building Decree (BBL) and aesthetics requirements, and the complete structural calculation are all included. So there is nothing to select separately here. Answer a few short questions in the next step and we will prepare a suitable quote for you.
Select your elements
Choose the elements you want a drawing or calculation for.
Help me choose
Our advice:
Suggested selection
- ✓
- Custom work / on request, we will prepare a quote for you.
AI systems can make mistakes; verify important information. You enter your contact details yourself.
Choices per element
Indicate which services you want per element.
Remove one to avoid paying twice. Check whether this duplicate is intentional (e.g. a different location).
Help me choose
What do you choose per element?
Construction drawing
Floor plans, elevations and sections of your renovation. For most environmental permits this is the basic document.
Structural
Choose how far we work out the structural part:
- None: no structural calculation. Note: for load-bearing parts this is often legally required.
- Calculation only: the strength of the load-bearing elements is determined.
- Drawing only: the detailed dimensions of the structure.
- Calculation + drawing: the most complete option, ideal for the permit application.
In doubt?
For work on a load-bearing part, choose "Calculation + drawing" to be safe. Not sure? Leave the structural part set to "None"; our specialist will assess it and advise you.
Construction drawing
A construction drawing contains the technical details of your renovation: floor plans, sections and elevations. For most renovations this is required for the environmental permit.
Structural calculation recommended. For this element a structural calculation or drawing is almost always required for the permit. Do you have your own structural engineer? Then you can skip this.
Structural calculation
For load-bearing structures a calculation is often legally required. Choose the right scope based on what you already have and what is needed for the permit application.
Indicative price based on . Enter the area for the exact price.
Choose the scope of the structural calculation
Your choice
Structural calculation
The structural scope will be determined in your file after assessment by our specialist.
Action required:
Action required:
Project questions
Answer the questions below about your project.
Help me choose
How to answer the project questions
Tips
Unsure about an answer? Choose "I don't know" where possible, or put it in the comments field. Do you have documents such as construction drawings or photos? Upload them; that makes your quote faster and sharper.
Action required:
Upload your archive drawings, construction drawings and/or sketches here. For each file you can indicate below what it is.
Click to choose files or drag them here
PDF, JPG, PNG, DWG or DXF. Max 25MB per file, max 10 files
Action required:
Address & Contact details
Enter the address of the property and your contact details.
Help me choose
Do you have the project address at hand?
Enter the project address
Enter the address of the property the drawing is for below. This is needed for the permit application.
No problem
You can add the address later. Fill in your contact details so we can reach you.
Contact details
Check your request
Check the details below and send your request.
Property
Elements
Address & Contact
Summary
What happens after I have submitted my request or order?
- Step 1 You complete your request or order and immediately receive a confirmation by email.
- Step 2 Our draughtsman or structural engineer will contact you within 1 working day.
- Step 3 We prepare the construction drawing and/or structural calculation for you.
- Step 4 You receive a draft and can still submit changes until everything is to your liking.
- Step 5 After approval you receive the final documents for your permit application or to carry out your renovation.
- Step 6 Is the drawing rejected by the municipality or are adjustments needed? Then we take care of the required revisions for you.
Why BouwTekeningMaken ?
- Fixed, transparent prices
- Fast delivery, express possible
- Drawing and structural calculation under one roof
- Delivered permit-ready
- Personal contact with your own draughtsman


